Call 811 before you dig
Planting a tree, building a fence or adding a mailbox? New Jersey law says call 811 first, it's free, and private lines like sprinklers aren't marked.
Checked 2026-11-06. General information, summarized from the official sources listed. Rules, dates and products change, so check the sources before relying on them. Not professional, legal or safety advice: installs, gas and electrical work need a licensed pro and often a permit. Businesses are listed for convenience, not endorsed.
At a glance
- New Jersey law: call 811 at least three full business days before digging (not counting weekends and holidays). It's free.
- It applies to small jobs too: planting trees and shrubs, fences, decks and patios, mailbox posts.
- Wait for the marks: utilities mark their lines with paint, flags or stakes. Outline your dig area in white first if you can.
- Private lines aren't marked: sprinklers, yard lights, gas to a grill or pool heater, invisible dog fences are yours to locate.
Why call, and when
State law: Anyone digging in New Jersey must call 811 (New Jersey One Call) at least three full business days, not counting weekends and holidays, before starting. The service is free. (Source: New Jersey One Call)
NJ Board of Public Utilities: Call before any digging, whatever the depth and however well you know the yard. Homeowners have most often been cited for planting trees or shrubs, building patios, decks and fences, and installing mailboxes without calling. If you hire a contractor, make sure they called. (Source: NJ Board of Public Utilities)
If you hire a contractor, calling is their job, but make sure they got a ticket.
Mark your spot, then wait
- If you can, outline the area you plan to dig in white paint or flags before you call, and tell the operator how many areas you marked.
- Call 811 (or file online) at least three full business days ahead.
- Wait until the utilities have marked their lines with paint, flags or stakes. Don't start if lines aren't marked.
- Start within the ticket's window: work must begin within 10 business days, and the ticket expires after 45 business days.
NJ One Call: Mark the proposed dig area in white before calling, if possible. A markout takes three business days; digging must begin within 10 business days; the ticket expires after 45 business days. (Source: New Jersey One Call)
What the colors mean
- Red: electric power lines and cables
- Yellow: gas, oil and steam
- Orange: phone, cable, internet and alarm lines
- Blue: drinking water
- Green: sewer and drain lines
- Purple: reclaimed water and irrigation
- Pink: temporary survey marks
- White: the area you plan to dig
APWA color code: These colors follow the uniform color code used for utility markings. (Source: American Public Works Association)
If your project is right on top of a marked line, the state's advice is to consider moving it.
Lines nobody will mark
NJ One Call: Private underground lines are not marked unless their owner is a New Jersey One Call member. The property owner or tenant is responsible for locating them, or hiring someone to. Utilities usually mark electric and gas only up to the meter. (Source: New Jersey One Call)
- Gas lines to a grill, pool heater, or heater in a shed or garage.
- Electric lines to yard lights, a pool pump or outbuildings.
- Sprinkler systems, low-voltage landscape lighting, invisible dog fences and data cables.
Digging near the marks
Marks show roughly where a line runs, not its exact depth. Near a mark, dig gently by hand and expose the line before using any power equipment.
PSE&G: If you hit a gas line or smell gas, leave right away, get at least 350 feet away, and call PSE&G at 1-800-880-7734 or 911 from outside. (Source: PSE&G)